Construction of the new Reuben Hoar Library in Littleton is making rapid progress: all of the windows are in place and the building is now watertight, so the finishes have started. Siding is going on at the upper floor, and painting has begun inside at the lower floor. The construction manager has reported that they are on schedule for the library to open this fall. We are excited that our energy-efficient design (energy use reduced by 82%!) is coming to life and will be enjoyed by the community soon.